Widen to the preliminary 80-foot section with south-side walkway, traffic signal work and stormwater drainage.
FY2026–27 capital programme: City identifies a separate planned Phase IV widening scheme for the Danbury-to-I-Avenue segment, with no independently confirmed construction start.
Proposed regional detention basin reduces silt sent toward DWR's California Aqueduct and stores flash-flood runoff; $15 million planning estimate.
FY2026–27 preliminary engineering and land acquisition: City's 2026–27 project description says right-of-way purchases continued and engineering feasibility was scheduled for the budget year.
Fund a batch of city road rehabilitation and accessibility works; the grouped programme is one record, not thirteen invented articles.
FY2026–27 City approved capital programme: City identifies 13 named roadway projects in the FY2026–27 capital programme; individual streets and construction contracts require separate records when published.
Plan pavement and intersection changes on the street corridor, subject to exact engineering drawings and future construction authorization.
FY2026–27 capital project list: The city FY2026–27 online budget names Escondido Avenue Street Improvements as a standalone capital item, not an issued completion record.
Develop wastewater treatment capacity and associated infrastructure, with scope to be refined against treatment plant design documents.
FY2026–27 municipal CIP portfolio: City FY2026–27 CIP includes the Hesperia Wastewater Treatment Plant as a named programme entry; operational construction stage must be separately proved.
Extend or upgrade wastewater collection infrastructure along the I-15 development corridor; published budget does not prove mobilization.
FY2026–27 city CIP listing: Municipal capital budget lists I-15 corridor sewer extension as its own sewer-project entry, separate from the water project.
Widen the roadway to a five-lane configuration with utilities and at-grade railroad crossing coordination; existing bridge reconstruction is tracked separately.
2026 project construction progress report: City identifies Beador Construction advancing the Ranchero Road Phase III roadway widening work, distinct from the aqueduct bridge construction contract.
Replace the aqueduct crossing with capacity for eventual three travel lanes each direction; $31.17 million revised project estimate.
December 2025 resumed construction: City's FY2026–27 project summary says bridge demolition and rebuild restarted in December 2025 after a rebid; City reports old bridge demolished.
Rehabilitate around three miles using replacement, overlay and seal treatments, markings and accessible curb ramps.
FY2025–26 construction/bid commencement: City's FY2026–27 project sheet explicitly says bidding and construction started FY2025–26 and continues into FY2026–27.
Public, original-source-backed development and capital improvement projects in Hesperia, California, separated by current, future and completed status. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.