Current projects
6 projects
Construction documented by the project owner. Status is a dated research snapshot.
Roads & mobilityFinal segment of a multi-year reconstruction of 32nd Avenue South, including road pavement, storm drains, drinking-water and sanitary sewers.
Roads & mobilityReplace damaged concrete slabs and upgrade sidewalks, bicycle routes and crossings to accessibility standards.
Roads & mobilityFull road reconstruction with concrete pavement, new drinking-water mains, sanitary and storm sewer upsizing, sidewalks and street lighting.
Roads & mobilityFour-block-area rebuilding of road surfaces, drinking-water lines, stormwater and sewer mains, accessible sidewalks and public street lighting.
Water & utilitiesFlood control extending earthen embankments and structural floodwalls along the Red River and water treatment plant.
Roads & mobilityNeighbourhood road reconstruction, water and sanitary service renewal, stormwater improvements, asphalt and public street lighting.
Future projects
4 projects
Planned or in design or procurement; construction not yet confirmed.
Roads & mobilityMain Avenue pavement, buried utilities, storm drainage, lighting, ADA pedestrian and sidewalk replacement.
Roads & mobilityTwo-phase complete street and utility reconstruction improving pedestrian, transit and vehicular access on 1st Avenue North.
Roads & mobilityProposed replacement and raising of the existing 1988 Red River crossing to operate above the design flood stage.
Public facilitiesFuture conversion or rebuilding of the Civic Center campus as an events and convention destination connected by skyway to nearby hotels.
Historical archive · 2 completed projectsPast developments and original source records.
View archive →