Current projects
1 projects
Construction documented by the project owner. Status is a dated research snapshot.
Roads & mobilityWoodbridge Township Engineering lists its 2026 Milling and Resurfacing Programme among Active Construction Projects; individual street completions must be verified separately.
Future projects
11 projects
Planned or in design or procurement; construction not yet confirmed.
Roads & mobilityThe current township Engineering active-project inventory names Avenel Street improvements; physical phase and contractor notice-to-proceed are not separately dated.
Water & utilitiesWoodbridge engineering lists Bucknell Avenue sewer improvement works as a distinct municipal capital project, without dated completion.
Roads & mobilityTownship Engineering documents traffic signal improvements at Oak Tree Road/Wood Avenue as a named public works project; commissioning unverified.
Roads & mobilityMunicipal current-project inventory names an Omar Avenue extension and Paddock Street roadway improvements as one corridor capital project.
Water & utilitiesNJ Infrastructure Bank January 2026 approval provides $6.5m financing for a larger 3,500-ft replacement sewer from Stafford Road to the 48-inch RVSA trunk, plus grinder pumps for 10 homes.
Roads & mobilityWoodbridge's 2026 Engineering capital project directory identifies combined Ford Avenue/Burnham Drive roadway improvement works.
Water & utilitiesTownship capital inventory names replacement of Judy Drive pump station force main and associated sanitary sewer assets.
Parks & public realmWoodbridge Township lists a proposed pedestrian/cycle bridge connecting Alvin P. Williams Park to Woodbridge Marina; completion unverified.
Roads & mobilityThe municipal Engineering project roster identifies Middlesex Avenue for roadway capital improvements, with specific physical start unverified.
Water & utilitiesWoodbridge's Engineering list includes remedial soil excavation at the former Sewaren Treatment Plant as a named environmental civil-works project.
Parks & public realmTownship Engineering lists Cypress Park Phase 2 under named active project works; no dated final acceptance verified.