5600 West Paving and ADA Ramp Improvements
Renew asphalt and reconstruct accessible pedestrian ramps along the state route connector.
Source reviewed 31 Oct 2026
View project →West Valley City, Utah
A source-backed record of construction and planned development.
Sources reviewed 31 Oct 2026 · Selected projects, not a complete municipal register
1 projects
Construction documented by the project owner. Status is a dated research snapshot.
Renew asphalt and reconstruct accessible pedestrian ramps along the state route connector.
Source reviewed 31 Oct 2026
View project →9 projects
Planned or in design or procurement; construction not yet confirmed.
Reconstruct the roadway with central turn lane, sidewalks, lighting, curbs and drainage.
Source reviewed 31 Oct 2026
View project →Mill existing asphalt and overlay roads while replacing noncompliant pedestrian ramps.
Source reviewed 31 Oct 2026
View project →Apply slurry seal, crack seal, chip seal and polymer seal treatments in the municipal maintenance programme.
Source reviewed 31 Oct 2026
View project →Construct missing sidewalk sections along a state road and improve pedestrian continuity.
Source reviewed 31 Oct 2026
View project →Resurface the rear car park and improve drainage, park strip and pedestrian sidewalk at City Hall.
Source reviewed 31 Oct 2026
View project →Build a missing north-south road link with drainage, lighting and trail connection to Mountain View Corridor.
Source reviewed 31 Oct 2026
View project →Rebuild pavement and install centre turn and bicycle lanes, sidewalk and stormwater improvements.
Source reviewed 31 Oct 2026
View project →Rebuild and modestly widen roadway with buffered cycle lanes, a 12-foot trail and street lighting.
Source reviewed 31 Oct 2026
View project →Coordinate a joint full-depth road reconstruction and railroad-crossing improvement with Magna.
Source reviewed 31 Oct 2026
View project →Past developments and original source records.
View archive →