ChaseDesk← California cities

Ventura, California · Project encyclopedia

Projects in Ventura, California.

Find upcoming development and work underway. Every project keeps a permanent source-backed article and full history.

4 upcoming5 underway3 completed

Owner records reviewed 31 Oct 2026. Curated collection, not exhaustive.

Latest documented evidence

Selected dated project-owner milestones; this is not a live feed or confirmation that work happened today.

Find current projects

Search 9 curated current project records, or open the historical archive.

9 current projects

Upcoming and preconstruction

4 selected projects

Planned, reviewed, approved or tendered. Forecast dates are not evidence that construction started.

Roads & mobility · Planned or in design; construction not confirmed

Main Street Bridge over Ventura River Replacement

Replace aging Main Street bridge serving city traffic and a recreational crossing near the US101 interchange; construction funding not confirmed.

2026 major projects programme: City identifies bridge replacement at design and environmental review, not funded physical construction.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Planned or in design; construction not confirmed

Santa Paula Branch Line Rail-to-Trail Corridor

Create a separated cycle and pedestrian connection from eastern neighborhoods toward Montalvo and Saticoy; listed as planned, not completed.

2026 major-project programme: City identifies a four-mile planned Class I trail along the Santa Paula Branch Line.

Source evidence reviewed

View permanent record ↗
Public facilities · Planned or in design; construction not confirmed

Ventura Interim Fire Station 7

Design and deliver interim Fire Station 7 facilities; physical construction award not proven by design-stage listing.

2026 city design-phase register: Ventura lists the interim station project in design, distinct from completed site preparation.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Planned or in design; construction not confirmed

US101 Oak Street Off-Ramp Improvement

Proposed ramp improvements and traffic-safety work, subject to CEQA/NEPA environmental clearance and later design.

2026 city environmental review status: City explicitly identifies the project as planning and environmental review, with more funding needed.

Source evidence reviewed

View permanent record ↗

Documented construction

5 selected projects

Works that project owners identify as under construction; not a live on-site report.

Roads & mobility · Construction identified in cited city record

Olivas Park Drive Extension and Santa Clara River Levee

Extend Olivas Park Drive about 4,500 feet and construct around 5,400 feet of levee and floodwall to improve circulation and river flood protection.

August 2025 construction commencement: City's project briefing identifies an August 2025 start and work continuing toward summer 2027.

Source evidence reviewed

View permanent record ↗
Parks & public realm · Construction identified in cited city record

Surfers Point Managed Retreat Phase II

Continue shoreline adaptation and managed retreat works begun under the earlier project, with separate Stage I historical delivery in 2013.

2026 City current construction list: City lists Phase II in its active construction portfolio.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Construction identified in cited city record

Telegraph Road Resurfacing Ashwood-to-Hill

Road surface renewal, enhanced traffic safety and accessibility on a heavily used Ventura corridor.

August 2025 construction start: City listed this named street-resurfacing segment as construction starting in August 2025.

Source evidence reviewed

View permanent record ↗
Water & utilities · Construction identified in cited city record

Eastside to Midtown Waterline Interconnect

Install underground pipelines providing a reliable interconnection between eastern and midtown water service areas.

2026 city construction register: Ventura Public Works lists the Eastside-to-Midtown interconnect in construction phase.

Source evidence reviewed

View permanent record ↗
Water & utilities · Construction identified in cited city record

Pierpont Weymouth Lane Stormwater Lift Station

Improve stormwater pumping capacity and drainage performance in the coastal Pierpont neighborhood.

2026 City construction projects: City lists the Weymouth Lane Pierpont lift station as a construction-phase project.

Source evidence reviewed

View permanent record ↗

Completed projects remain accessible

Historical project records are preserved for research without crowding the current-project funnel.

Ventura historical archive · 3 records

Verified openings and completions, with original evidence and permanent articles.

Open archive ↗

Curated original-source public infrastructure and development projects for Ventura, California. Status categories distinguish construction, future work and verified delivered assets. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.