Tacoma, Washington · Project encyclopedia

Projects in Tacoma, Washington.

Find upcoming development and work underway. Every project keeps a permanent source-backed article and full history.

10 upcoming0 underway2 completed

Owner records reviewed 31 Oct 2026. Curated collection, not exhaustive.

Latest documented evidence

Selected dated project-owner milestones; this is not a live feed or confirmation that work happened today.

Find current projects

Search 10 curated current project records, or open the historical archive.

10 current projects

Upcoming and preconstruction

10 selected projects

Planned, reviewed, approved or tendered. Forecast dates are not evidence that construction started.

Roads & mobility · Design, grant, land-use or funding proposal; physical construction not independently verified

Fishing Wars Memorial Bridge Replacement Design

Develop a seismically resilient replacement crossing using concrete piles and bioswales for port traffic; city currently projects at least $263m construction cost.

2026 $7.6m BUILD design award: Tacoma announced a $7.6m federal award for environmental analysis and final design; physical bridge replacement remains unfunded.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Design, grant, land-use or funding proposal; physical construction not independently verified

Puyallup Avenue Multimodal and Fife Access Corridor

Design street reconstruction, multimodal improvements, safer crossings and trail access on Puyallup Avenue.

2026 city project register: Tacoma lists Puyallup Avenue reconstruction and a walking/cycling link to the regional spuyaləpabš Trail in its current projects.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Design, grant, land-use or funding proposal; physical construction not independently verified

South 11th Street Paving and Pedestrian Connections

Repave South 11th Street and improve pedestrian access at Ridgewood, Grant, Ainsworth, Cushman and South I intersections.

28 April 2026 transportation programme draft: Tacoma six-year transport plan identifies this $3.227m grind-and-overlay and crossing improvement package as design-stage, not completed construction.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Design, grant, land-use or funding proposal; physical construction not independently verified

South 34th Street Bridge Deck Repair and Seismic Retrofit

Repair bridge deck and reinforce structural details for better earthquake resilience and reliable local traffic service.

2026 public works bridge portfolio: Tacoma identifies the bridge repair and seismic retrofit as a distinct municipal bridge programme, with no new completion certificate in the reviewed source.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Design, grant, land-use or funding proposal; physical construction not independently verified

South 38th Street and Cedar Crossing Safety Upgrade

Introduce safer pedestrian crossing facilities at a busy South Tacoma road intersection; exact completed traffic hardware remains to be confirmed.

2026 City projects listing: Tacoma includes a named crossing-upgrade project to improve pedestrian safety at the 38th/Cedar junction.

Source evidence reviewed

View permanent record ↗
Industry · Design, grant, land-use or funding proposal; physical construction not independently verified

Bridge Industrial South Tacoma Warehouse Proposal

Proposed light industrial and logistics development; this planning proposal is not an issued construction permit or completed asset.

2026 city development review listing: Tacoma describes a developer proposal for approximately 150 acres of former railroad site with four warehouse buildings and 2.5m sq ft of floorspace.

Source evidence reviewed

View permanent record ↗
Public facilities · Design, grant, land-use or funding proposal; physical construction not independently verified

Tacoma Municipal Building Exterior Preservation

Restore exterior facade components of a significant public landmark, with scope following heritage compliance and final public works designs.

2026 Tacoma city capital project portfolio: Municipal preservation of the historic Tacoma Municipal Building envelope is identified in its public project register.

Source evidence reviewed

View permanent record ↗
Public facilities · Design, grant, land-use or funding proposal; physical construction not independently verified

Historic Cushman and Adams Substations Future Reuse

Plan compatible public/community uses of two historic electrical buildings after utility functions move; no completed restoration inferred.

2024 completed public engagement; 2026 future reuse programme: Tacoma and TPU completed visioning on reuse, but TPU expects to use existing substation assets until relocating around 2027.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Design, grant, land-use or funding proposal; physical construction not independently verified

Baker Middle School Safer Walking Routes

Upgrade crossing and access routes to improve walking, cycling and mobility around Baker Middle School.

2026 City project catalogue: Tacoma lists an active engagement and public works scheme for safer multimodal school access, without a confirmed completion date.

Source evidence reviewed

View permanent record ↗
Planning & development · Design, grant, land-use or funding proposal; physical construction not independently verified

Amici House North Warner Church Adaptive Reuse

Proposed adaptive reuse into young adult group housing with an on-site resident manager and 11 parking stalls; not a confirmed occupied building.

2026 city land-use proposal listing: Developer seeks to convert a church building into accommodation for up to 51 occupants, with parking and street/sidewalk improvements.

Source evidence reviewed

View permanent record ↗

Documented construction

0 selected projects

Works that project owners identify as under construction; not a live on-site report.

Completed projects remain accessible

Historical project records are preserved for research without crowding the current-project funnel.

Tacoma historical archive · 2 records

Verified openings and completions, with original evidence and permanent articles.

Open archive ↗

Evidence-backed public construction, planning and completed projects in Tacoma, Washington, with separate underway, upcoming and historical records. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.