Bluff Street Downtown Road Renewal
Reconstruct junctions, drainage, pavement and landscaping for safer downtown circulation.
Source reviewed 31 Oct 2026
View project →St. George, Utah
A source-backed record of construction and planned development.
Sources reviewed 31 Oct 2026 · Selected projects, not a complete municipal register
3 projects
Construction documented by the project owner. Status is a dated research snapshot.
Reconstruct junctions, drainage, pavement and landscaping for safer downtown circulation.
Source reviewed 31 Oct 2026
View project →Build a new bus operations depot, maintenance bays, office space, refuelling and fleet parking.
Source reviewed 31 Oct 2026
View project →Expand the inclusive playground by roughly 2.5 acres with an Ice Age themed area and extended train tracks.
Source reviewed 31 Oct 2026
View project →7 projects
Planned or in design or procurement; construction not yet confirmed.
Widen I-15 to three lanes in both directions and improve bridges and city street connections.
Source reviewed 31 Oct 2026
View project →Construct roughly 5,300 feet of roadway, utilities and pedestrian/cycle alignment with connection to the new bridge.
Source reviewed 31 Oct 2026
View project →Develop a road link identified as a construction priority in the city's adopted transportation programme.
Source reviewed 31 Oct 2026
View project →Construct additional reservoir storage to support the municipal water system.
Source reviewed 31 Oct 2026
View project →Replace ageing sewer infrastructure identified in the municipal wastewater master-plan implementation.
Source reviewed 31 Oct 2026
View project →Design and build an electric substation to reinforce local power capacity.
Source reviewed 31 Oct 2026
View project →Increase reclaimed water production capacity from seven to eighteen million gallons per day, including new pump works.
Source reviewed 31 Oct 2026
View project →Past developments and original source records.