Spokane, Washington · Project encyclopedia

Projects in Spokane, Washington.

Find upcoming development and work underway. Every project keeps a permanent source-backed article and full history.

0 upcoming9 underway3 completed

Owner records reviewed 31 Oct 2026. Curated collection, not exhaustive.

Latest documented evidence

Selected dated project-owner milestones; this is not a live feed or confirmation that work happened today.

Find current projects

Search 9 curated current project records, or open the historical archive.

9 current projects

Upcoming and preconstruction

0 selected projects

Planned, reviewed, approved or tendered. Forecast dates are not evidence that construction started.

Documented construction

9 selected projects

Works that project owners identify as under construction; not a live on-site report.

Roads & mobility · Work is recorded underway; completion not independently verified

Spokane 2026 Arterial Pavement Repair

Repair severely degraded asphalt in selected major traffic lanes and restore road surfaces for safety and durability.

2026 city engineering construction register: Spokane Engineering lists a separate 2026 full-depth arterial pavement repair programme in its active construction catalogue.

Source evidence reviewed

View permanent record ↗
Water & utilities · Work is recorded underway; completion not independently verified

Desmet–Superior Damaged Sewer Main Reroute

Build replacement sewer alignment, coordinate access and remove a damaged 10-inch collection sewer section.

2026 city sewer construction register: Spokane lists a project to reroute an existing damaged 10-inch sewer main at this intersection.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Work is recorded underway; completion not independently verified

Greene, Freya and Havana Bridge Deck Rehabilitation

Preserve bridge deck surfaces through replacement coatings/overlays and traffic-control closures; completion still subject to later acceptance.

September 2026 city construction notices: Spokane Engineering includes four bridge decks for preservation, with work on Greene and Havana announced for September 2026.

Source evidence reviewed

View permanent record ↗
Parks & public realm · Work is recorded underway; completion not independently verified

Southeast Sports Complex Parking and New Restroom

Increase access and parking capacity, new controlled entries and restrooms. First-phase early-October opening was forecast, not certified.

15 September 2026 City Parks works update: Spokane Parks reports KXLY construction expanding the lot from 88 to around 140 spaces, alongside a new restroom/storage building.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Work is recorded underway; completion not independently verified

Pacific Avenue Greenway Howard–Sherman

Add pedestrian crossings and a calmer east–west cycling alignment linking downtown to the University District.

2026 City Engineering construction portfolio: Spokane lists a distinct cross-town neighborhood greenway linking downtown and the University District.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Work is recorded underway; completion not independently verified

Riverside Avenue Monroe–Wall Streets Rebuild

Resurface the road, remove obsolete trolley infrastructure, replace water utility and signal assets, and reinstate protected bicycle lanes.

2026 City construction portfolio: Engineering lists corridor reconstruction with a 2-inch pavement overlay, trolley-track removal, traffic signals and waterline work.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Work is recorded underway; completion not independently verified

North Hillyard Sidewalk Accessibility Improvement

Close missing sidewalk links and rebuild curb ramps to make school and transit journeys safer for local residents.

2026 City works list: City construction list includes separated and adjacent sidewalks and ADA curb ramps to improve connectivity.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Work is recorded underway; completion not independently verified

US395 North Spokane Corridor Stage 3 Sprague–Alki

Build another North Spokane Corridor highway segment linking Sprague to Alki, eventually joining the wider I-90 interchange.

September 2025 WSDOT groundbreaking: WSDOT says Kuney Construction started Stage 3 work in September 2025, while full NSC connection to I-90 is a multi-phase 2026–2030 programme.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Work is recorded underway; completion not independently verified

2026 Spokane Local Access Grind and Overlay

Rebuild local road pavement with new asphalt and ADA-compliant curb ramps at selected street locations.

2026 Engineering construction programme: City lists a 2026 neighborhood street rehabilitation package including curb-to-curb milling, resurfacing, striping and curb access.

Source evidence reviewed

View permanent record ↗

Completed projects remain accessible

Historical project records are preserved for research without crowding the current-project funnel.

Spokane historical archive · 3 records

Verified openings and completions, with original evidence and permanent articles.

Open archive ↗

Evidence-backed public construction, planning and completed projects in Spokane, Washington, with separate underway, upcoming and historical records. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.