Plan new play area, footpaths, picnic furniture, community garden, small playfield and restroom upgrades to support the Little Brook neighborhood.
7 August 2026 owner redevelopment update: Seattle Parks publishes community-designed redevelopment, a closed-during-works plan and identified public grants without a verified physical mobilisation date.
Replace old nature-themed play structures while retaining historical artistic elements and improve restroom access and paved walking connections.
29 July 2026 design completion and construction forecast: Seattle Parks says planning, design and permits are finished and physical works were anticipated November 2026.
Replace the Carkeek play area, upgrade parking-to-playground paths, install safety surfacing and preserve the iconic Salmon Slide if feasible.
25 August 2026 permit-design update: The City reports construction documents and building permits under preparation, with an early 2027 anticipated construction start.
Build a 12-foot-wide shared walking, cycling and rolling path linking James Baldwin Elementary, Northacres Park and Pinehurst Station, with raised crossing and drainage.
17 September 2026 final-design milestone: SDOT confirms final design and Seattle City Light pole relocations, while actual path construction was expected in 2027.
Repair and strengthen the 1917 moveable-bridge fixed structures and design a safer west-side walking/cycling route; no new bascule project is claimed.
July 2026 early design inspection and survey: SDOT says it is at approximately 10-percent design, inspecting bridge deficiencies. West-side footway widening is still funding-dependent.
Plan pavement and heavy-haul traffic improvements along a major port truck route with safer pedestrian/bicycle connections.
2026 SDOT current-project register: SDOT lists East Marginal Way as a major designated freight corridor targeted for road and active-mode improvements; a later contractor start was not established.
Improve serviceability of the Argo bridge while future replacement alternatives undergo engineering evaluation.
2026 SDOT bridge project register: SDOT lists a structural repair scheme for the 4th Avenue S Bridge, separate from a longer-term bridge replacement study.
Deliver priority bus and transit access changes along the J Line to connect Downtown, Eastlake and the U District with improved pedestrian access.
2026 SDOT current transit project register: Seattle Transportation lists the RapidRide J corridor as a current street and transit improvement scheme; project-specific construction acceptance not verified.
Build playground and restrooms, parkour space, accessible 0.34-mile loop, promenades, nature play, lighting and multi-use field improvements. Playfield G3 is a separate later contract.
20 October 2026 owner construction update: Seattle Parks reports A-1 Landscaping working on the multi-zone Garfield Super Block after a fall 2025 construction start.
Evidence-backed public construction, planning and completed projects in Seattle, Washington, with separate underway, upcoming and historical records. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.