Latest documented evidence Selected dated project-owner milestones; this is not a live feed or confirmation that work happened today.
Find current projects Search 11 curated current project records, or open the historical archive .
Search project or location Project typeAll types Public facilities Parks & public realm Rail & transit Water & utilities
11 current projects
No projects match those filters.
Upcoming and preconstruction 7 selected projects
Planned, reviewed, approved or tendered. Forecast dates are not evidence that construction started.
Public facilities · Preferred replacement design in environmental review; construction not funded San Diego proposes replacing its storm-damaged, closed Ocean Beach Pier after structural assessments found major rehabilitation impractical.
August 2026: City confirmed the Ocean Beach Pier replacement remains in environmental assessment and permitting rather than an active construction contract. Estimated project cost is $170m–$190m with only part of the funding identified.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Rail & transit · Concept selection and environmental planning Potential higher-quality transit links to San Diego International Airport.
2026: SANDAG reports completion of a 2026 concept-study addendum.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Public facilities · Capital programme; start unverified Proposed replacement or expanded library service for the Oak Park neighbourhood.
Fiscal year 2026: City budget identifies allocation to design and construction of a new Oak Park library.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Public facilities · Bid and award phase New three-bay fire station of approximately 11,500 square feet.
2026: City project profile describes the station in the bid-and-award phase.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Public facilities · Construction start unverified Proposed 4,300-square-foot expansion and rehabilitation of existing branch.
2025: City project profile lists a design-build award target in winter 2025.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Parks & public realm · Master plan adopted; build not verified Approved plan for habitat restoration, public recreation and accessible visitor accommodation.
14 May 2024: City Council approved master plan amendment and certified the environmental document.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Public facilities · Design and reuse consultation Rehabilitation plan for the historic former Logan Heights library building.
15 November–15 December 2024: City held a public survey on potential future uses of the former branch building.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Documented construction 4 selected projects
Works that project owners identify as under construction; not a live on-site report.
Water & utilities · Construction and testing programme Programme to produce approximately 30 million gallons of purified water each day.
2026: City lists twelve construction projects contributing to the Phase 1 programme.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Water & utilities · Pump station works underway; nearby Friars Road reopened The Morena Pump Station will divert around 32 million gallons of wastewater daily to North City's treatment and purification system, a key part of Pure Water San Diego.
29 August 2026: The City listed a 29 August 2026 reopening notice for Friars Road's eastbound lane following underground works, restoring two-way movements while station construction continued.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Water & utilities · Documented treatment-facility construction Advanced treatment plant and associated pumping to supply Miramar Reservoir.
2026: City lists the North City treatment facility and associated pump station in Phase 1.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Water & utilities · Construction phases documented Upsizing and replacement of more than 4,000 feet of trunk sewer.
2026: City project page describes phased sewer works and active traffic management impacts.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Selected projects located in the City of San Diego. Pure Water programme and separately identifiable capital packages are cross-referenced, not treated as unrelated programmes. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.