Salem, Oregon · Project encyclopedia

Projects in Salem, Oregon.

Find upcoming development and work underway. Every project keeps a permanent source-backed article and full history.

5 upcoming5 underway2 completed

Owner records reviewed 31 Oct 2026. Curated collection, not exhaustive.

Latest documented evidence

Selected dated project-owner milestones; this is not a live feed or confirmation that work happened today.

Find current projects

Search 10 curated current project records, or open the historical archive.

10 current projects

Upcoming and preconstruction

5 selected projects

Planned, reviewed, approved or tendered. Forecast dates are not evidence that construction started.

Roads & mobility · Planned or in design; construction not confirmed

McGilchrist Complete Street Phase III

Extend sidewalks, bikeways, drainage and reconstruct railroad/creek crossings; do not conflate with completed Phase II.

2026 utility relocation report: Salem says Phase III utility work is active but roadway construction scheduled 2027–29.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Planned or in design; construction not confirmed

Pringle Creek Civic Center–Riverfront Pathway

Build 12-foot multiuse route and suspended bridge under Commercial Street to connect downtown parks and trails.

October 2026 final design start: City schedule puts final design in 2026–27 and physical construction 2027–28.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Planned or in design; construction not confirmed

State Street 12th–17th Complete-Street Project

Design lane reconfiguration, bicycle routes, accessible sidewalks, signals and water system improvements.

2026 design review: Salem confirms this scheme is in design, not construction; build forecast for 2028.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Planned or in design; construction not confirmed

Marine Drive NW New Road and Shared Path

Build two-lane link with 12-foot trail, crossings, stormwater and streetlights to Wallace Marine Park.

2026 right-of-way acquisition: City reports design and land purchase underway while main construction forecast 2028.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Planned or in design; construction not confirmed

Fisher Road NE Urban Street Upgrades

Add sidewalks, cycle facilities, sewer and stormwater systems, safer crossings and Sunnyview signal.

June 2026 alternatives workshop: City describes options analysis and owner feedback, with construction proposed 2028.

Source evidence reviewed

View permanent record ↗

Documented construction

5 selected projects

Works that project owners identify as under construction; not a live on-site report.

Public facilities · Reported works; final completion unverified

Salem Civic Center Seismic Retrofit

Retrofit City Hall earthquake performance, replace atrium/skylight, improve access and facilities, with early 2027 return forecast.

27 February 2026 construction update: Salem confirms new shear walls installed and interior wiring and plumbing underway.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Reported works; final completion unverified

Silverton Road NE Pavement and Crossings

Repave road, replace two signals, add three crossing locations, ADA ramps and bicycle lanes.

2026 owner construction status: Salem identifies Emery & Sons as contractor and says corridor work is underway.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Reported works; final completion unverified

Doaks Ferry Road NW Road Rehabilitation

Resurface roadway with accessible curb ramps and new striping.

2026 owner contractor listing: Salem's named 2026 pavement programme identifies Roy Houck Construction on this location.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Reported works; final completion unverified

Commercial Street SE Pavement and Water Renewal

Replace pavement, curb ramps, utility water lines, signs and minor signals.

2026 named contractor schedule: City documents road paving and two water main replacements contracted as part of 2026 road repairs.

Source evidence reviewed

View permanent record ↗
Parks & public realm · Reported works; final completion unverified

Riverfront Park Inclusive Playground Construction

Expand inclusive play area, accessible synthetic turf, rock scramble and associated park power infrastructure.

5 August 2026 progress announcement: Salem confirms physical installation of accessible park play features during 2026.

Source evidence reviewed

View permanent record ↗

Completed projects remain accessible

Historical project records are preserved for research without crowding the current-project funnel.

Salem historical archive · 2 records

Verified openings and completions, with original evidence and permanent articles.

Open archive ↗

Source-backed public infrastructure and development projects in Salem, Oregon, divided into underway, upcoming and completed project histories. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.