29th Street Phases 1 and 2 Storm Sewer Improvements
New drainage works designed to reduce floodwater damage and soil erosion on West 29th Street and along Alabama Avenue.
Source reviewed 31 Oct 2026
View project →Pueblo, Colorado
A source-backed record of construction and planned development.
Sources reviewed 31 Oct 2026 · Selected projects, not a complete municipal register
3 projects
Construction documented by the project owner. Status is a dated research snapshot.
New drainage works designed to reduce floodwater damage and soil erosion on West 29th Street and along Alabama Avenue.
Source reviewed 31 Oct 2026
View project →Drainage study and drainage-capacity reconstruction for the fairgrounds-adjacent stormwater system.
Source reviewed 31 Oct 2026
View project →Protective rehabilitation of a critical sanitary sewer serving Pueblo's municipal wastewater treatment works.
Source reviewed 31 Oct 2026
View project →7 projects
Planned or in design or procurement; construction not yet confirmed.
New west-side roadway and two intersection improvements intended to connect neighbourhoods and planned development.
Source reviewed 31 Oct 2026
View project →Accessible pavement, landing and passenger facilities at west-side bus stops for people using public transport.
Source reviewed 31 Oct 2026
View project →Potential new rail overpass with multimodal connections between the west side and downtown.
Source reviewed 31 Oct 2026
View project →Proposed reconstruction of the Lake/Orman intersection with pedestrian accessibility upgrades.
Source reviewed 31 Oct 2026
View project →New accessible multipurpose trail, drainage and grading improvements linking neighbourhoods and existing paths.
Source reviewed 31 Oct 2026
View project →Pavement protective sealcoat improvements and longevity work on airfield taxiways.
Source reviewed 31 Oct 2026
View project →Planned asphalt milling and overlay of the 6th Street street surface.
Source reviewed 31 Oct 2026
View project →Past developments and original source records.
View archive →