Latest documented evidence Selected dated project-owner milestones; this is not a live feed or confirmation that work happened today.
Find current projects Search 8 curated current project records, or open the historical archive .
Search project or location Project typeAll types Parks & public realm Roads & mobility Water & utilities
8 current projects
No projects match those filters.
Upcoming and preconstruction 3 selected projects
Planned, reviewed, approved or tendered. Forecast dates are not evidence that construction started.
Roads & mobility · Planned or in design; construction not confirmed Install five new/upgraded signalised crossings and lighting to address unsafe crossing gaps. Funding and procurement do not yet establish completion.
Autumn 2026: PBOT says design complete at three crossings; contractor selection and other crossings were forecast for fall.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Roads & mobility · Planned or in design; construction not confirmed New signals, sidewalks, dedicated turns and multiuse path. Spring 2027 construction is forecast.
October 2026: PBOT reports 60% plans finished and 95% design scheduled with railroad and property coordination.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Water & utilities · Planned or in design; construction not confirmed Plan a new seismic-resistant main under the Willamette. Not under construction as of review.
October 2026: Water Bureau explicitly lists the crossing as paused, with construction timing dependent on future funding.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Documented construction 5 selected projects
Works that project owners identify as under construction; not a live on-site report.
Water & utilities · Reported works; final completion unverified Build filtration plant with 135-million-gallon-a-day design capacity and supply pipelines for Portland drinking water. Delivery is targeted for 2029.
22 October 2026: Water Bureau reports 43% of project complete at end of September 2026.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Roads & mobility · Reported works; final completion unverified Replace the overpass with earthquake-ready road, freight, pedestrian and cycling connectivity. Construction spans 2026 to 2027.
October 2026: PBOT confirms existing bridge demolished in summer and foundations/retaining walls advancing.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Roads & mobility · Reported works; final completion unverified Add protected cycle lane, ADA ramps, mini-roundabout, sidewalks and street trees. Owner still lists finishing works.
October 2026: PBOT reports remaining beacon energisation, signage, final planting and protective fencing.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Water & utilities · Reported works; final completion unverified Replace 114,000 older meters and enable daily automatic readings. Installation and full digital commissioning are different phases.
2026 rollout: Water Bureau is replacing older customer meters before a 2027 digital reading installation phase.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Parks & public realm · Reported works; final completion unverified Build new trail connection with access and ecological protections. Late-fall 2026 completion was an estimate, not accepted delivery.
11 May 2026: Portland Parks reports physical mobilisation and temporary canoe-launch restrictions.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Source-backed public infrastructure and development projects in Portland, Oregon, divided into underway, upcoming and completed project histories. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.