ChaseDesk← California cities

Jurupa Valley, California · Project encyclopedia

Projects in Jurupa Valley, California.

Find upcoming development and work underway. Every project keeps a permanent source-backed article and full history.

9 upcoming2 underway1 completed

Owner records reviewed 31 Oct 2026. Curated collection, not exhaustive.

Latest documented evidence

Selected dated project-owner milestones; this is not a live feed or confirmation that work happened today.

Find current projects

Search 11 curated current project records, or open the historical archive.

11 current projects

Upcoming and preconstruction

9 selected projects

Planned, reviewed, approved or tendered. Forecast dates are not evidence that construction started.

Roads & mobility · Proposed, under study or with project-stage funding; construction not confirmed

Market Street Bridge Replacement

Replace the crossing with a four-lane, approximately 1,200-foot structure, upgraded approach roads, channel work and a regional multipurpose path.

2026 major-project register: Jurupa Valley and Riverside County still list a proposed replacement bridge on this crossing.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Proposed, under study or with project-stage funding; construction not confirmed

58th Street Gap Closure

Plan a missing-link street connection, with detailed construction stage and phasing dependent on project approval and funding.

4 June 2026 five-year CIP proposal: The proposed FY2026–31 programme names the 58th Street gap closure with a $1.5 million line item.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Proposed, under study or with project-stage funding; construction not confirmed

Valley Way and Jurupa Road Realignment

Realign an existing arterial junction and approaches, subject to approved project design and later contractor procurement.

4 June 2026 CIP proposal: The June five-year capital project table lists the Valley Way and Jurupa Road realignment at $1.5 million.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Proposed, under study or with project-stage funding; construction not confirmed

Agua Mansa Union Pacific Railroad Grade Crossing

Improve the Agua Mansa railroad crossing and associated vehicle, pedestrian and rail safety; do not conflate with Jurupa Road grade separation.

4 June 2026 CIP proposal: City's five-year programme includes $3.25 million for this separate railroad crossing intervention.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Proposed, under study or with project-stage funding; construction not confirmed

Cantu-Galleano Ranch Road Gap Closure (CIP 21106)

Close a missing Cantu-Galleano Ranch Road section to provide a continuous connection, subject to design and right-of-way constraints.

4 June 2026 capital programme: The adopted/considered five-year capital schedule identifies project 21106 with $675,213 across project phases.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Proposed, under study or with project-stage funding; construction not confirmed

Bellegrave Avenue Widening: Cantu-Galleano to Van Buren

Plan arterial widening on Bellegrave Avenue, including lane and junction work following detailed plans and funding.

4 June 2026 capital programme: The FY2026–31 CIP proposes project 21107 with $814,213 listed across phases.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Proposed, under study or with project-stage funding; construction not confirmed

Limonite Avenue Widening, Bain to Homestead

Improve and widen the Bain-to-Homestead Limonite Avenue corridor; forecast funding is not evidence of construction authorization.

4 June 2026 five-year CIP: The city CIP lists about $10.09 million across available and future funding, including an $8 million unspecified future component.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Proposed, under study or with project-stage funding; construction not confirmed

Mira Loma Safe Routes to School Sidewalk Gap Closure

Close missing sidewalks and access links to improve walking safety for schoolchildren and nearby residents.

4 June 2026 CIP report: Project 23108 is named at approximately $4.95 million, combining funding for school route connectivity.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Proposed, under study or with project-stage funding; construction not confirmed

Pacific Avenue Pedestrian and Bicycle Phase II

Complete more separated pedestrian and cycling infrastructure, safer crossings and accessible street facilities along Pacific Avenue.

4 June 2026 CIP five-year schedule: The separate Phase II (23115) is listed at about $2.48 million in the city programme.

Source evidence reviewed

View permanent record ↗

Documented construction

2 selected projects

Works that project owners identify as under construction; not a live on-site report.

Roads & mobility · Works or contractor activity reported; final acceptance unverified

Mission Boulevard Bridge over Santa Ana River

Replace the 70-year-old river crossing with a 1,100-foot four-lane bridge, median, shoulders and a separated pedestrian, cycle and equestrian trail connection.

2026 city current projects register: City identifies a $91 million replacement scheme, with a late-2029 anticipated completion, subject to later milestones.

Source evidence reviewed

View permanent record ↗
Roads & mobility · Works or contractor activity reported; final acceptance unverified

Jurupa Road Union Pacific Rail Grade Separation

Separate vehicle traffic from the Union Pacific railroad at Jurupa Road, with extensive utilities and road approach coordination.

2026 engineering coordination update: City updates report utility relocation, including pipeline work at Felspar and Jurupa Road, within the grade-separation programme.

Source evidence reviewed

View permanent record ↗

Completed projects remain accessible

Historical project records are preserved for research without crowding the current-project funnel.

Jurupa Valley historical archive · 1 records

Verified openings and completions, with original evidence and permanent articles.

Open archive ↗

Public projects and major development in Jurupa Valley, California, with separately sourced current, upcoming and completed records. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.