Replace existing water mains, hydrants, services and traffic impacts across the specified south-area water pressure zone.
13 August 2026 contract bids due: City procurement specified approximately 18,000 linear feet of ductile iron piping across Cherry, Dehn, Simms, Yukon and other streets; Jan 2027 proposed start.
Planned pedestrian crossings, bike access, ADA ramps, shelters and traffic calming around four transit station areas; contract advertisement does not prove site start.
7 October 2026 construction-management bids close: City requested project-management and inspection services following its public 2026 procurement for transit access improvements.
Renew waterproofed roofing while protecting historic buildings, pending a published contract award.
16 September 2026 construction tender deadline: Inglewood's municipal procurement solicited replacement roof systems for five separate structures at the heritage site.
Interior renovation of administrative office space; procurement does not show a completed fit-out.
28 October 2026 City Hall renovation tender closed: City solicited reconfiguration including interior walls, ceilings, finishes and mechanical/electrical updates on two City Hall floors.
Improve stormwater inlet safety, reliability and protective hardware at specified catch basin locations.
12 August 2026 bids due: City solicited repair/replacement of anti-rodent/ARS devices and steel plate/rod installation on low-impact-development catch basins.
Deliver three mobility hubs (>1,000 spaces), 10-bay bus plaza, Florence Avenue pedestrian bridge and downtown street improvements; old elevated people mover is not part of this funded phase.
22 October 2026 groundbreaking: City marked a $250 million first-phase ceremonial groundbreaking; it states actual construction would start in November 2026 and finish forecast spring 2028.
Replace deteriorating neighbourhood water distribution pipelines for more reliable service; utility-led rather than municipal-funded.
February 2026 utility construction schedule start: Golden State Water Company states February 2026–January 2027 works window for area main replacement.
Original-source-backed built environment and public infrastructure project records for Inglewood, California, with separate current, future and completed archives. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.