Widen sidewalks, install street trees and lighting, center median and narrower traffic lanes while moving utilities underground.
2026 city bid-stage project update: The public works register lists underground power relocations and roadway redesign with a winter 2026 to summer 2028 construction schedule; bid-stage information does not prove works have started.
Plan play areas, accessible trails, community garden, dog park, sports court and habitat education space.
1 July 2026 Metro bond-funded park announcement: City describes the 41-acre undeveloped site as a future phased park, with construction dependent on available capital and design.
Develop plans for accessible trails, picnic spaces, playground, garden, viewpoints, parking and restroom.
1 July 2026 city parks planning update: City sets out concept/design work for a 16-acre park and explicitly states later construction needs additional funding.
Improve ADA accessibility and plan a native-tree and shrub nursery, alongside broader forest-health work.
1 July 2026 bond-project announcement: City includes the Brite House as a distinct proposed environmental-center rehabilitation within its parks capital programme.
Develop a separated walking and cycling path through Columbia View Park supporting regional greenway links.
2026 parks planning update: Gresham reports securing two Oregon Community Paths grants worth more than $1.3 million for a multiuse path; the award is not construction evidence.
Extend regional shared-use walking and cycling connections toward Fairview, subject to route approvals and capital funding.
FY2026–27 capital programme: City describes continued design of the fourth phase in its transport/footpaths capital programme, without construction handover evidence.
Upgrade stormwater pipes, pedestrian crossing beacons, sidewalk accessibility and roadway safety between two arterial endpoints.
July 2026 reported construction period: City lists construction July 2026–September 2027 for new drainage, sidewalks, crossings and lane changes; no final acceptance is reported.
Improve seismic performance of a major municipal storage reservoir to protect drinking-water availability during earthquakes.
October 2026 site work period: The city's construction listing identifies Emery and Sons Construction as contractor and October–December 2026 site works.
Close the sidewalk gap linking Rockwood Central Park to 182nd Avenue, providing an accessible pedestrian route.
Late September 2026 construction start window: The City lists Brown Contracting for September–October 2026 sidewalk work, with final acceptance not yet independently established.
Rebuild deficient curb ramps to improve mobility-device access and crossing safety on municipal streets.
2026 current works programme: Public Works identifies ongoing installation of sloped sidewalk ramps at city crossings, often ahead of paving and subject to local closures.
Public infrastructure, capital schemes and source-backed completed projects in Gresham, Oregon, with distinct underway, upcoming and historic records. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.