Port Gardner Combined Sewer Storage Facility
Build a major combined-sewer overflow storage and stormwater-treatment facility with associated connecting pipelines.
Source reviewed 31 Oct 2026
View project →Everett, Washington
A source-backed record of construction and planned development.
Sources reviewed 31 Oct 2026 · Selected projects, not a complete municipal register
2 projects
Construction documented by the project owner. Status is a dated research snapshot.
Build a major combined-sewer overflow storage and stormwater-treatment facility with associated connecting pipelines.
Source reviewed 31 Oct 2026
View project →Replace the aging bridge-attached water main to improve reliability and firefighting water capacity.
Source reviewed 31 Oct 2026
View project →7 projects
Planned or in design or procurement; construction not yet confirmed.
Reroute an asphalt trail away from the riverbank and add a wetland boardwalk and viewing deck.
Source reviewed 31 Oct 2026
View project →Construct riverbank habitat improvements, a pier and floating dock followed by a privately delivered park phase.
Source reviewed 31 Oct 2026
View project →Develop a regional stormwater treatment and flood reduction facility with associated drainage upgrades.
Source reviewed 31 Oct 2026
View project →Replace aging wastewater headworks and pumps at the city's treatment facility under a GC/CM delivery plan.
Source reviewed 31 Oct 2026
View project →Increase drainage pipe capacity, address flooding on Evergreen Way, and improve water quality.
Source reviewed 31 Oct 2026
View project →Extend sanitary sewer connections and replace a water line on 116th Street SE with road restoration.
Source reviewed 31 Oct 2026
View project →Evaluate declining street trees and potential replanting, spacing and soil remediation options.
Source reviewed 31 Oct 2026
View project →Past developments and original source records.
View archive →