Latest documented evidence Selected dated project-owner milestones; this is not a live feed or confirmation that work happened today.
Find current projects Search 9 curated current project records, or open the historical archive .
Search project or location Project typeAll types Parks & public realm Rail & transit Roads & mobility
9 current projects
No projects match those filters.
Upcoming and preconstruction 5 selected projects
Planned, reviewed, approved or tendered. Forecast dates are not evidence that construction started.
Roads & mobility · Planned or in design; construction not confirmed Propose an eight-block north–south protected cycle route connecting central Eugene destinations.
2026 public works current register: City lists protected bikeway on east side of Lincoln but no final construction acceptance.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Roads & mobility · Planned or in design; construction not confirmed Repave roadway, widen sidewalks and replace drainage pipes serving Ayres Pond/Dodson Slough.
2026 public works capital register: City lists road repaving, streetlight upgrades and two culvert replacements without a certified start.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Rail & transit · Planned or in design; construction not confirmed Proposed quad gates, safety medians, one-way conversions and pedestrian signals to reduce routine train-horn noise.
2026 capital project scope: City describes reconstruction of ten rail crossings, while final quiet-zone approval remains unverified.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Roads & mobility · Planned or in design; construction not confirmed Repave Bethel Drive, add street trees, lighting and separated walking/bicycle connectivity.
June 2026 projected start: City specifies paving and a shared-use path but a current physical start cannot be established from the schedule.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Parks & public realm · Planned or in design; construction not confirmed Develop public play, open spaces and park amenities in southwest Eugene.
2026 City parks development register: Parks project directory identifies a 5.25-acre new park with completion targeted 2027.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Documented construction 4 selected projects
Works that project owners identify as under construction; not a live on-site report.
Roads & mobility · Reported works; final completion unverified Replace the span-wire signals, introduce bicycle signal and ADA curb extensions for safer crossing.
May 2026: Eugene lists the mast-arm signal replacement as an active works project, with July as earlier forecast completion.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Roads & mobility · Reported works; final completion unverified Add missing sidewalks, stormwater upgrades, lighting and accessible ramps on OR99.
Spring–fall 2026: City reports two construction phases with current-year ramp, lighting and pavement works.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Roads & mobility · Reported works; final completion unverified Add ADA ramps, flash beacons and improved crossing markings and visibility at identified locations.
July–September 2026 works window: The owner scheduled construction of four pedestrian crossing upgrades during summer 2026.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Roads & mobility · Reported works; final completion unverified Rehabilitate pavement and ADA ramps while adding buffered bike lanes, speed cushions and sidewalk safety.
July 2025 works start: City reports staged road rehabilitation on three streets and a planned summer 2026 finish.
Source evidence reviewed 30 Oct 2026
View permanent record ↗ Source-backed public infrastructure and development projects in Eugene, Oregon, divided into underway, upcoming and completed project histories. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.