Rainbow Boulevard: Blue Diamond Road to CC-215
Expand traffic capacity and improve drainage, walkways, crossings and utilities on the Rainbow Boulevard corridor.
Source reviewed 31 Oct 2026
View project →Enterprise, Nevada
A source-backed record of construction and planned development.
Sources reviewed 31 Oct 2026 · Selected projects, not a complete municipal register
2 projects
Construction documented by the project owner. Status is a dated research snapshot.
Expand traffic capacity and improve drainage, walkways, crossings and utilities on the Rainbow Boulevard corridor.
Source reviewed 31 Oct 2026
View project →Widen the Southern 215 Beltway, improve drainage and lights, rebuild bridge structures and modify freeway ramps.
Source reviewed 31 Oct 2026
View project →7 projects
Planned or in design or procurement; construction not yet confirmed.
Build an ADA-accessible shared-use paved path with protective features, road crossing, wayfinding and trail connections.
Source reviewed 31 Oct 2026
View project →Plan traffic-capacity and safety improvements on the Cimarron corridor in growing Enterprise neighborhoods.
Source reviewed 31 Oct 2026
View project →Plan an east-west arterial improvement to increase roadway connectivity south of the Beltway.
Source reviewed 31 Oct 2026
View project →Advance a second east-west roadway segment with railway-crossing requirements and new collector connections.
Source reviewed 31 Oct 2026
View project →Plan roadway improvements and construction administration for the southwest valley Cactus Avenue corridor.
Source reviewed 31 Oct 2026
View project →Design a stormwater and railroad drainage connection in the southwest valley.
Source reviewed 31 Oct 2026
View project →Prepare staged roadway improvements, junction accessibility and drainage in southwest Las Vegas Valley.
Source reviewed 31 Oct 2026