Mill damaged roads and lay asphalt resurfacing on the streets later specified in city construction drawings.
FY2025–26 capital appropriation plan: Municipal CIP names a separate $3.2255 million Overlay 2026 package; funding does not alone verify construction mobilisation.
Reconstruct sidewalk obstacles, ramps and selected concrete pedestrian approaches to improve accessibility.
FY2025–26 capital project approval: CIP names a $1 million ADA concrete improvement programme distinct from the later FY2026–27 CDBG sidewalk allocation.
Build roundabout at El Cajon Boulevard/Douglas Avenue, protected cycle segments, sidewalk redesign and accessible crossings.
12 May 2026 council grant appropriation report: Council agenda allocates $2.712 million SANDAG grant and local funds; scheme was in design for a summer 2027 anticipated construction start.
Improve disabled-access sidewalk and ramps using targeted CDBG infrastructure funding.
FY2026–27 CDBG action-plan funding: City identified sidewalk-access work as an earmarked multiyear programme through 2028; award and final selected sites remain unspecified.
Install or enhance neighbourhood streetlights with multiyear CDBG support, separate from the traffic signal programme.
12 May 2026 council approved change order report: Agenda records an existing Perry Electric works contract and May 2026 extra-scope proposal for lights; physical installation is not independently completed.