2nd and Gaines Street Flood-Resilience Road Raising
Road raising, drainage and intersection improvements intended to preserve bridge connectivity during higher Mississippi River stages.
Source reviewed 31 Oct 2026
View project →Davenport, Iowa
A source-backed record of construction and planned development.
Sources reviewed 31 Oct 2026 · Selected projects, not a complete municipal register
7 projects
Construction documented by the project owner. Status is a dated research snapshot.
Road raising, drainage and intersection improvements intended to preserve bridge connectivity during higher Mississippi River stages.
Source reviewed 31 Oct 2026
View project →Major accessible Mississippi River park with new adventure play, plaza, hill and ice-rink public spaces.
Source reviewed 31 Oct 2026
View project →Renewal of 4th Street road pavement and traffic pattern, including two-way downtown blocks.
Source reviewed 31 Oct 2026
View project →Full street reconstruction on Division Street serving access to Putnam Museum and Fejervary Park.
Source reviewed 31 Oct 2026
View project →Resurfacing and accessibility renewal along Harrison Street with traffic maintained.
Source reviewed 31 Oct 2026
View project →Replacement of a deteriorated Duck Creek crossing and its approaches.
Source reviewed 31 Oct 2026
View project →Large-diameter urban sewer interceptor renewal spanning multiple years and traffic management stages.
Source reviewed 31 Oct 2026
View project →3 projects
Planned or in design or procurement; construction not yet confirmed.
Planned active-travel link joining the Goose Creek trail to the wider Duck Creek system.
Source reviewed 31 Oct 2026
View project →Future crossing safety improvements intended to enable a riverfront railroad quiet-zone arrangement.
Source reviewed 31 Oct 2026
View project →Planned adaptive reuse of 1883 downtown commercial structure into shops and possible housing.
Source reviewed 31 Oct 2026
View project →Past developments and original source records.
View archive →