Design replacement or rehabilitation of strategically important Citrus water pumps with seismic resilience.
August 2025 city FY2026–27 CIP adopted budget: CIP describes a seismically deficient drinking water pump station; design money was scheduled in FY2027 and major rebuild in FY2028.
Construct two-storey public childcare and community-event facility with ground-level 3,000-square-foot outdoor play area.
FY2026–27 biennial CIP programme: Budget identifies a 6,000-square-foot infant/toddler childcare centre plus 6,000-square-foot upstairs event center, with large later-year allocations.
Rehabilitate sewer pumping equipment, controls and selected facilities to strengthen wastewater transfer reliability.
FY2026–27 Sanitation District capital plan: CIP identifies sewer lift-station rehabilitation in FY2026 priority spending but no separately dated finished asset.
Rehabilitate selected road surfaces under the neighbourhood resurfacing programme, separate from the 2026 Westlake site notice.
FY2026–27 CIP mapped project area: Daly City adopted CIP maps the St Francis road maintenance area as project T21; specific construction year and work completion require owner update.
Build 113 affordable homes in the second stage of the community redevelopment, maintaining distinct historical records for Phase I.
16 May 2025 official phase-two groundbreaking: San Mateo County announced Phase II construction launch for 113 additional affordable homes beside completed Midway I.
Surface-preservation works and street striping on designated Westlake neighbourhood blocks.
27 August 2026 streetwork schedule: City published August 2026 phased slurry sealing, with construction scheduled through October and no site-by-site completion statement.
Original-source-backed built environment and public infrastructure project records for Daly City, California, with separate current, future and completed archives. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.