Current projects
1 projects
Construction documented by the project owner. Status is a dated research snapshot.
Roads & mobilityMassDOT project 609410 lists the Route 123 Centre Street intersection with Cary and Lyman Streets in Construction status; the active project is separate from the planned Plymouth Street crossing.
Future projects
6 projects
Planned or in design or procurement; construction not yet confirmed.
Roads & mobilityMassDOT project 600649 identifies replacement of the Allen Street bridge B-25-010 over Salisbury Brook as Design.
Roads & mobilityMassDOT project 606143 lists intersection improvements at Route 27 Crescent Street, Quincy Street and Massasoit Boulevard in Design status.
Roads & mobilityMassDOT project 607818 proposes both intersection works at Lyman/Grove/Summer streets and replacement of Grove Street Bridge over Salisbury Plain River; 2027 is programme timing.
Roads & mobilityMassDOT project 609052 was advertised for construction bids by September 5, 2026, proposing traffic signals, curbs, ADA ramps and drainage. Advertisement is not a verified start.
Roads & mobilityMassDOT project 609520 lists bicycle and pedestrian improvements on Route 123 across Brockton and Abington in Design; the multijurisdiction limits are disclosed.
Water & utilitiesBrockton DPW describes Phase 4 of CWSRF-16743 sewer rehabilitation, with trenchless liners, spot excavations and manhole upgrades, without a verified 1 November physical work status.
Historical archive · 5 completed projectsPast developments and original source records.