Congress Street Fixed Span Bridge Replacement
The 2026–27 engineering goals call for starting a fixed-span replacement of the Congress Street Bridge; a physical construction start is not verified.
Source reviewed 1 Nov 2026
View project →Bridgeport, Connecticut
A source-backed record of construction and planned development.
Sources reviewed 1 Nov 2026 · Selected projects, not a complete municipal register
0 projects
Construction documented by the project owner. Status is a dated research snapshot.
11 projects
Planned or in design or procurement; construction not yet confirmed.
The 2026–27 engineering goals call for starting a fixed-span replacement of the Congress Street Bridge; a physical construction start is not verified.
Source reviewed 1 Nov 2026
View project →Bridgeport's 2026–27 engineering programme names Elton Rogers Park Dam replacement as Phase One of the Ox Brook Flood Control Project; owner timelines remain goals.
Source reviewed 1 Nov 2026
View project →The engineering programme lists starting replacement of the State Street–Commerce Drive crossing; spring 2026 was a target, not independently confirmed handover.
Source reviewed 1 Nov 2026
View project →The city reports easement acquisition and planned construction of the Woodrow Avenue Bridge replacement; final permit and on-site status require later verification.
Source reviewed 1 Nov 2026
View project →Chopsey Hill Road Bridge is separately named in the 2026–27 bridge-replacement programme, with easements and construction timing to be checked.
Source reviewed 1 Nov 2026
View project →Engineering goals identify Newfield Boat Ramp construction following delayed permits; the budget's target date is not a site-confirmed start.
Source reviewed 1 Nov 2026
View project →Bridgeport names Brewster Street Bridge replacement in its 2026–27 engineering works programme, without certifying physical progress.
Source reviewed 1 Nov 2026
View project →The planned roundabout at Noble Avenue and Beardsley Park Drive is in design and permitting, with 2028 construction targeted by the city.
Source reviewed 1 Nov 2026
View project →City engineering identifies replacement of seven Park Avenue traffic signals under federal funding; procurement delays were reported and construction is not inferred.
Source reviewed 1 Nov 2026
View project →The 2026–27 engineering goals call for beginning Island Brook Bridge replacement design, distinct from any later build contract.
Source reviewed 1 Nov 2026
View project →Bridgeport's engineering goals identify completion of a Rooster River retention project in cooperation with Fairfield at Fairchild Wheeler Golf Course; project completion is not verified.
Source reviewed 1 Nov 2026
View project →Past developments and original source records.