Build improved sidewalk and separated bike route and redesign Boyd Acres junction to modern safety standards.
2026 City phase sequencing statement: City separately schedules Phase II for January to fall 2027; Phase I Wells Acres roundabout is not counted as the new phase's completion.
Expand partial roundabout into an intuitive two-lane layout with ADA-compliant crossing and safer cycling connections.
2026 detailed design schedule: City describes design completion targeted end 2026 and construction beginning early 2027, without works mobilisation today.
Build missing street connection supporting pedestrian, cycle and vehicle travel between Third and Bond.
October 2026 owner construction programme: City lists a new east–west link to begin in early 2027 with completion targeted autumn, not verified as started.
Replace undersized 12-inch cast-iron main with 18-inch ductile iron pipe, improving distribution between Awbrey and Pilot Butte reservoirs.
July 2026 construction window: City confirms June 25 preconstruction open house followed by July–October 2026 works; no independent completion notice was located.
Build trunk sewer and residential laterals to enable septic connections while taking an old pump station out of service.
13 July 2026 physical works notice: City states construction began early July with trenching for a new gravity main and planned decommissioning of the Phoenix pump station.
Improve Galveston crossings, water-pressure hardware, accessible sidewalk, street lighting, paving and protected cycling across separate phases.
Fall 2026 owner phased construction update: City expressly marks Phase 1 complete and schedules a second-stage raised crossing plus pressure-reducing valve, followed by 2027 reconstruction.
Build shared-use path, school-area crossings and protected/buffered walking/cycling links along three connected key-route projects.
June 2026 Phase I construction start: City schedules Phase I construction from east of Larkspur Trail to Eagle Road starting June 2026, with ODOT retaining later segments.
Rebuild Franklin Avenue undercrossing drainage, accessibility and cycling/pedestrian connections as part of Midtown Crossings.
August 2026 construction phase announcement: Citywide works map records Franklin Avenue undercrossing closure for stormwater and multimodal improvements through May 2027.
Public infrastructure, capital schemes and source-backed completed projects in Bend, Oregon, with distinct underway, upcoming and historic records. Confidence percentages are editorial, not calibrated. Project pages distinguish source dates, forecast dates and research checks.