Sunrise Manor · Water & utilities

Range Wash West Tributary at Alexander

Plan flood-control channel capacity and connected stormwater infrastructure in the northeast valley.

County design, advertisement or consultation; construction not establishedEvidence: 5 May 2026 flood-control design entry · Reviewed 31 October 2026

Latest verified development

5 May 2026 flood-control design entry

County's design list includes Range Wash West Tributary at Alexander; approval and physical mobilisation have not been independently established.

View original record ↗

Project in numbers

Range WashArea or extent
Alexander RoadOriginal record milestone
Design, no build proofEvidence boundary

About the project

Plan flood-control channel capacity and connected stormwater infrastructure in the northeast valley. Sunrise Manor is an unincorporated Clark County community. A corridor may follow a community boundary; only sourced locality claims are asserted.

Verified development history

  1. 5 May 2026 flood-control design entry

    County's design list includes Range Wash West Tributary at Alexander; approval and physical mobilisation have not been independently established.

    Original evidence ↗
  2. 31 October 2026 documentary review

    County records checked for stage and Sunrise Manor planning geography; later milestones and completion remain unverified.

    Original evidence ↗

What happens next

Require a dated notice to proceed, site progress or opening record before advancing status.

What remains uncertain

Research reviewed 31 October 2026. County design progress and bid openings do not prove construction began. An existing park is not proof of its original opening date. Editorial confidence reflects documentation, not project delivery probability.

Official maps, designs and site visuals

Original publisher links, not unlicensed photographs or invented project renderings.

Sources and documents

82% editorial confidence · Evidence assessment

Editorial confidence describes how well the cited records support this account. It is not a calibrated probability of project completion. Source event dates are distinct from research review dates.

Sources reviewed 31 October 2026.