Latest verified development
11 September 2026 city design contractMullins LLC commissioned for surveys, rights-of-way, drainage, geotechnical and roadway design; not physical construction.
Project in numbers
About the project
Expansion of Peoples and Pryor roads identified for proposed school access and growing development. Mullins LLC commissioned for surveys, rights-of-way, drainage, geotechnical and roadway design; not physical construction.
Verified development history
- 10 September 2026 city TIF 8 proposal
Expansion of Peoples and Pryor roads identified for proposed school access and growing development.
Original evidence ↗ - 11 September 2026 city design contract
Mullins LLC commissioned for surveys, rights-of-way, drainage, geotechnical and roadway design; not physical construction.
Original evidence ↗
What happens next
Require a later dated owner work or acceptance notice before changing status.
What remains uncertain
Evidence reviewed 31 October 2026. Stage labels reflect the most recent identified project-specific owner statement and may lag field conditions. A planned start or anticipated completion is not evidence the event happened. Current programme listings do not always confirm every individual segment is physically mobilised. Editorial confidence assesses original-source support, not probability of delivery.
Official maps, designs and site visuals
Original publisher links, not unlicensed photographs or invented project renderings.
Sources and documents
- Original project authority announcement, register or completion report ↗
- Additional official municipal or project programme context ↗
87% editorial confidence · Evidence assessment
Editorial confidence describes how well the cited records support this account. It is not a calibrated probability of project completion. Source event dates are distinct from research review dates.
Sources reviewed 31 October 2026.