Claims & confidence Expand for evidence
Confidence is a dated, editorial judgement of source support, not a statistically calibrated probability. The reported existence of a project schedule and the chance of that schedule being met are different claims.
- 95% confidenceGlendale reports Pencco opened the facilityDated municipal announcement.
- 95% confidenceThe manufacturing address is 5090 W. Camelback RoadCity location record.
- 95% confidenceWater-treatment chemicals are the stated productMunicipal project description.
- 90% confidenceFinal construction cost is establishedNo audited outturn was found in cited city statement.
95% directly documented by primary evidence; 85–90% strong but date-limited; 60–80% forecasts/uncertain outcomes; around 55% speculative future results. Unverified means evidence is missing, not that the project was disproved. Read original sources ↓.
- Location
- 5090 W. Camelback Road, Glendale 95% confidence
- Classification
- Industry · Manufacturing expansion 95% confidence
- Source-backed stage
- Factory opening confirmed January 2026 95% confidence
- Source event
- 16 January 2026 city announcement 90% confidence
- City
- Glendale, Arizona 95% confidence
- Directory
- Past projects 95% confidence
Project timeline
Milestones recorded by the referenced sources, with scheduled dates and unverified next steps separately identified. No automatic live tracking is claimed.
- 16 January 2026Recorded
City announces manufacturing facility has opened 95% confidence
- Date not establishedNot verified
Final project capital expenditure 90% confidence
Project history and evidence
Glendale's January 2026 economic-development announcement says Pencco, Inc. opened its Arizona manufacturing operation at 5090 West Camelback Road. 95% confidence
The plant is intended to produce speciality chemicals for municipal, mining and industrial water systems. The official source establishes the opening, but not final construction expenditures or precise building completion day. 90% confidence
Evidence boundary: Official allocations, construction notices and proposed deadlines do not establish physical completion or available subcontract opportunities. Dates are research snapshots, not a live site inspection.