Claims & confidence Expand for evidence
Percentages express dated editorial confidence in documentary support, not statistically calibrated probabilities. Published plans and forecasts are not proof of physical work or on-time completion.
- 95% confidenceProject designated ST0990Town capital project profile.
- 95% confidenceTown reports 100% completionProject status label.
- 90% confidencePublished construction window ran winter 2023–summer 2026Town retrospective project profile.
- 95% confidenceThe route connects 148th Street to Greenfield RoadTown's project title and scope.
95% directly documented by original sources; 85–90% strong but date-limited; 60–80% conditional forecasts. 'Not verified' means evidence was not established, not that the event cannot occur. Original sources ↓
- Location
- Ocotillo Road between 148th Street and Greenfield Road, Gilbert 95% confidence
- Classification
- Roads · Corridor completion 95% confidence
- Source-backed stage
- Town's project status states 100% complete 90% confidence
- Project or programme ID
- ST0990 95% confidence
- Evidence date
- Winter 2023–Summer 2026 published works window 90% confidence
- Directory
- Past projects 95% confidence
Project timeline
Recorded source events and future schedules are separated. Unknown dates stay undated; no automatic live monitoring is claimed.
- Winter 2023Recorded
Published construction window begins 90% confidence
Municipal schedule has seasonal, not exact-day resolution.
- Summer 2026Recorded
Published completion window ends 90% confidence
Town later lists project 100% complete; exact handover date not supplied.
- By 23 October 2026Recorded
Town status explicitly marked 100% complete 95% confidence
Completion state verified in source snapshot.
Project history and evidence
Gilbert's ST0990 project concerns Ocotillo Road from 148th Street to Greenfield Road, separate from ST0540 between Greenfield and Higley. 90% confidence
The town now reports the ST0990 project as 100% complete. This does not establish completion of the adjacent ST0540 bridge corridor. 90% confidence
Evidence boundary: The stage and confidence values are editorial assessments based on the cited documents as of 23 October 2026. A project announcement, budget allocation or forecast is not proof of a live tender or completed work.