Baton Rouge · Roads & mobility

Goodwood Boulevard Sidewalks and Bicycle Lanes

The City-Parish documented active project initiation and named ProCivil Construction as contractor.

Owner-documented active fieldworks; latest available notice is not a guarantee work remains open todayEvidence: 1 October 2026 owner groundbreaking report · Reviewed 31 October 2026

Latest verified development

1 October 2026 owner groundbreaking report

The City-Parish documented active project initiation and named ProCivil Construction as contractor.

View original record ↗

Project in numbers

1.3 miles; ProCivilOwner-documented scope or cost
Goodwood Boulevard from Airline Highway to Sharp Road, BroadmoorNamed geographic or facility footprint
Owner-confirmed field phaseEvidence-based stage

About the project

MOVEBR and ProCivil began 1.3 miles of sidewalks, crosswalk safety and bicycle lane restriping. The City-Parish documented active project initiation and named ProCivil Construction as contractor.

Verified development history

  1. 30 September 2026 groundbreaking

    MOVEBR and ProCivil began 1.3 miles of sidewalks, crosswalk safety and bicycle lane restriping.

    Original evidence ↗
  2. 1 October 2026 owner groundbreaking report

    The City-Parish documented active project initiation and named ProCivil Construction as contractor.

    Original evidence ↗

What happens next

Seek owner-submitted substantial completion or opening records before moving this entry to the historical archive.

What remains uncertain

Source reviewed 31 October 2026. Construction classifications reflect dated owner reporting, not continuous on-site verification. Parishwide and intercity infrastructure is attributed only to a documented city corridor or city-side asset. Capital planning, a bid, a proposed voter measure and design do not independently establish site construction. Editorial confidence represents documentary quality, not statistical completion probability.

Official maps, designs and site visuals

Original publisher links, not unlicensed photographs or invented project renderings.

Sources and documents

91% editorial confidence · Evidence assessment

Editorial confidence describes how well the cited records support this account. It is not a calibrated probability of project completion. Source event dates are distinct from research review dates.

Sources reviewed 31 October 2026.