ChaseDesk← Avondale projects

Future · Project record

Charles M. Wolf Water Resource Center expansion

City's planned $155m water infrastructure expansion. 92% confidence

Sources reviewed 23 October 2026 · Original evidence

Claims & confidence Documentary evidence

These percentages are editorial assessments of documentary support, not statistically calibrated probabilities.

  • 95% confidence A source document identifies this named project.Original project source linked below.
  • 92% confidence City's planned $155m water infrastructure expansion.Published project description; reported scope may change.
  • 85% confidence Avondale identifies planned investment, not verified full commissioning.The cited page supports this research classification as of the review, but is not an on-site survey.
  • 80% confidence The current lifecycle state may have changed after the dated review.No live construction-monitoring capability is claimed.
Municipality
Avondale, Arizona 95% confidence
Project
Charles M. Wolf Water Resource Center expansion 95% confidence
Source-backed category
Future 85% confidence
Case or project reference
Original municipal project listing 95% confidence
Research review
23 October 2026 95% confidence
Population basis
100,983 (2025 Census PEP) 95% confidence

Project timeline

The review date is not a construction event. Unknown outcomes are not converted into facts.

  1. Linked published recordRecorded

    Project source documents or reports the work 85% confidence

    Avondale identifies planned investment, not verified full commissioning.

  2. 23 October 2026Recorded

    ChaseDesk editorial source review 95% confidence

    This is a dated editorial review, not a new municipal site inspection.

  3. Date not verifiedNot verified

    Actual construction and delivery

    Later events require fresh original documentation.

Project history and evidence

City's planned $155m water infrastructure expansion. 92% confidence

Avondale identifies planned investment, not verified full commissioning. 85% confidence

The original source is linked below. A municipal budget, application, construction window or published projection does not by itself prove an active bid opportunity or completed works. The classification is tied to the evidence available at the time of review.

This is a selected municipal project record, not a live bid listing or an exhaustive account of every permit.

Original source

More Avondale projects

Back to project directory →